Skip to main content

Moore Threads · 摩尔线程智能科技(北京)股份有限公司

Fabless

Incorporated in Beijing on 11 June 2020 and led by Zhang Jianzhong, formerly Nvidia’s China general manager.
Published

November 27, 2026

Chinese name: 摩尔线程智能科技(北京)股份有限公司 (Mó’ěr Xiànchéng Zhìnéng Kējì (Běijīng) Gǔfèn Yǒuxiàn Gōngsī)

TipWhy This Matters

Incorporated in Beijing on 11 June 2020 and led by Zhang Jianzhong, formerly Nvidia’s China general manager. BIS added three Moore Threads entities to the Entity List effective 17 October 2023 with a footnote 4 designation, in the same action as Biren. It listed on the STAR Market (688795) on 5 December 2025, issuing 70 million shares at ¥114.28. FY2025 revenue was ¥1.506 billion (+243%) with a net loss of ¥1.001 billion and R&D of ¥1.305 billion. Growth has since accelerated: January to September 2026 revenue was ¥3.289 billion (+319%), and the company swung to a net profit of ¥37.7 million (still a ¥130.7 million loss excluding non-recurring items). Q3 2026 revenue alone was ¥1.552 billion. On 7 August 2026 the board approved a plan to issue H shares and list on the HKEX Main Board. It still needs shareholder approval, a CSRC filing and HKEX review, and no HKEX application had been found as of 26 November 2026.

What does this firm design?

Full-function GPUs for AI training and inference, graphics rendering and video, all built on its own MUSA unified architecture across five generations (苏堤, 春晓, 曲院, 平湖 and, from 2025, 花港). The flagship MTT S5000 training/inference card offers up to 1,000 TFLOPS dense AI compute and underpins KUAE (夸娥) clusters of 10,000+ cards. Planned 花港-based chips are 华山 (AI training/inference) and 庐山 (graphics).

Key Facts

Category Fabless
Founded 2020
Location Beijing, Beijing Municipality
Product Focus Consumer and data-center GPUs
Node Sophistication Designed for leading-edge nodes; fabrication access constrained by its Entity List status
Listing Stage Listed
Entity List Yes — US Commerce BIS (Footnote 4 Foreign Direct Product Rule)
Last Verified 26 Nov 2026 (5 sources)

Design Scores

Score Made up of
Ambition 4.5/5 Domain difficulty 5, IP ownership 4
Progress 4/5 Design completeness 4, market readiness 4

Why these scores

  • Domain difficulty 5/5: Full-function data-centre and graphics GPUs are top-tier (5) design work.
  • IP ownership 4/5: Five generations of its own MUSA GPU architecture per the FY2025 annual report; use of any licensed third-party blocks is not disclosed, so 4 is kept.
  • Design completeness 4/5: Several GPU generations taped out and shipping, from consumer cards to the S5000 data-centre part.
  • Market readiness 4/5: ¥3.3 billion revenue in nine months of 2026 and first quarterly profit show volume data-centre shipments, though scale is far below Nvidia’s China peak.

Sources


NoteHave an update about this firm?

Spotted something wrong or out of date? Suggest a correction for Moore Threads (opens a short GitHub form with this firm filled in).

Back to Design Tracker