Hua Hong Wuxi (Fab 7, 12-inch specialty) · 华虹半导体(无锡)有限公司

Hua Hong Semiconductor | Fab

Hua Hong’s FIRST Wuxi 12-inch fab — the line that broke ground 2 March 2018 and took its first wafers 17 September 2019 — which this tracker had missed ent…
Published

October 11, 2026

TipWhy This Matters

Hua Hong’s FIRST Wuxi 12-inch fab — the line that broke ground 2 March 2018 and took its first wafers 17 September 2019 — which this tracker had missed entirely while covering the newer Fab 9 (Phase II) and Phase 3. This is also a naming correction: Wikipedia and secondary sources label the Wuxi site ‘Fab 7’; the $6.7B Phase-II fab is Fab 9. Design capacity grew from the original 40,000/month (phase 1, $2.5B of a ~10-year $10B site plan) to ~95,000/month installed, running above 100% utilization through 2025.

Chinese name: 华虹半导体(无锡)有限公司 (Huáhóng Bàndǎotǐ (Wúxī))

What does this facility make?

12-inch power semiconductors for EVs, PV, and industrial applications — IGBTs, MOSFETs, BCD analog — plus eNVM and RF platforms.

Why does it matter?

Fab 7 is where China’s 12-inch power-semiconductor migration started; its >100% utilization and the group-wide 2026 8-inch price hikes (>10%) define the supply picture for domestic EV power electronics. The Wuxi campus’s three-way split (Fab7 / Fab9 / Phase3) is why this tracker keeps per-phase entries.

Key Facts

Company Hua Hong Semiconductor
Type Fab
Category JV
Capability 12-inch specialty power — 90nm/65/55nm IGBT, MOSFET, BCD, eNVM; world’s first 12-inch power-device pure-foundry line; design 40,000 wafers/month, installed ~95,000/month, monthly input >100,000-equivalent reported 2025
Status Operational
Capacity 94,500 wafers/month (300mm), as of 2024-06 — installed capacity, company-stated; later releases stop giving a per-fab figure
Investment Not disclosed
Funding Source Local Govt
Location Wuxi, Jiangsu
Current Node 90nm–65/55nm specialty (production start Q4 2019)
Entity List No
Equipment Origin Not yet assessed
Last Verified Not recorded (newest source dated Oct 2026)

Technical Complexity

3.5/5

Technology Node Trajectory

  • 2019: 90nm–65/55nm specialty (production start Q4 2019)

Project Timeline

  • Mar 2018 — Wuxi 12-inch specialty fab (Fab 7 / 一期) breaks ground — $2.5B phase 1 of ~$10B site plan
  • Sep 2019 — First wafers out (55nm power products); world’s first 12-inch pure power-device foundry line
  • May 2021 — Phase 1 reaches its 40,000 wafers/month design capacity ahead of schedule
  • Dec 2025 — Installed capacity ~95,000 wafers/month; group utilization >100% (106.1% FY2025)