Skip to main content

Nexchip Hefei · 晶合集成

Nexchip Semiconductor Corporation | Fab

Mainland China’s third-largest foundry and the world’s ninth by 2025 revenue (Frost & Sullivan, as cited in its H-share listing), and the world’s largest d…
Published

November 27, 2026

TipWhy This Matters

Mainland China’s third-largest foundry and the world’s ninth by 2025 revenue (Frost & Sullivan, as cited in its H-share listing), and the world’s largest display-driver IC foundry. It was set up in 2015 by Hefei City Construction and Investment Holding with Taiwan’s Powerchip Technology as technology partner, a cross-strait structure now rare. STAR-listed (688249) since May 2023 and listed in Hong Kong on 10 July 2026 (HK$32.3 per H share). FY2025 revenue was ¥108.85亿 (+17.69%) and net profit attributable ¥7.04亿 (+32.16%, helped by a mask-technology transfer; recurring net profit fell 48.77%). In the first three quarters of 2026, revenue was ¥93.1亿 (+14.52%) and net profit attributable ¥4.75亿 (-13.70%).

Chinese name: 晶合集成 (Jīnghé Jíchéng)

What does this facility make?

Display driver ICs (DDIC) and CMOS image sensors (CIS) on 12-inch wafers — a foundry niche distinct from SMIC/Hua Hong’s broader logic focus.

Why does it matter?

Shows Taiwanese foundry know-how transferring into a mainland-listed, mainland-controlled entity through a JV structure, ahead of any Taiwan-specific tracker this project might build later. This entry covers existing operational capacity; the January 2026 fourth-phase expansion (¥35.5 billion, a new 55,000 wafer/month line) is tracked as its own entry, nexchip-phase4, since it is actively under construction rather than operational.

Key Facts

Company Nexchip Semiconductor Corporation
Type Fab
Category JV
Capability 12-inch (300mm) wafer foundry, display driver ICs and CIS
Status Operational
Capacity 137,900 wafers/month (300mm), as of 2025-12 — designed capacity; actual output 139.0K (100.8% utilisation). Phase IV (55,000/month, 40/28nm) not included
Investment Not disclosed
Funding Source Local Govt
Location Hefei, Anhui
Current Node 40nm high-voltage OLED DDIC (mass production)
Entity List No
Equipment Origin Not yet assessed
Last Verified 27 Nov 2026

Technical Complexity

2.5/5

Technology Node Trajectory

  • 2017: 110nm DDIC (A1 fab production start)
  • 2020: 150nm/110nm/90nm all in volume (90nm = 53% of 2020 revenue)
  • 2022: 55nm DDIC (mass production start)
  • 2025: 40nm high-voltage OLED DDIC (mass production)

Project Timeline

  • Apr 2015 — Hefei municipal government signs cooperation framework agreement with Powerchip Technology (力晶科技) for a wafer foundry
  • May 2015 — 合肥晶合集成电路有限公司 incorporated (Hefei City Construction and Investment Holding as founding shareholder); Powerchip signs equity-participation, management and technology-transfer agreements in October 2015
  • May 2023 — Lists on the Shanghai STAR Market (688249)
  • Jan 2026 — Phase 4 construction starts in Hefei Xinzhan zone: ¥35.5 billion, ~55,000 wafers/month 12-inch line for 40/28nm CIS, OLED driver and logic; equipment move-in and first production targeted for Q4 2026, full capacity Q2 2028 (tracked separately as nexchip-phase4)
  • Jul 2026 — H shares list on the Hong Kong Stock Exchange at HK$32.3, making Nexchip the third mainland foundry with an A+H listing after SMIC and Hua Hong
  • Nov 2026 — Announces ¥9.1 billion capital increase into Phase 4 vehicle 晶奕集成 (Nexchip ¥5.1bn, Hefei Construction Investment ¥3bn, Huaqin-backed Hefei Qinhe ¥1bn); Nexchip’s stake falls to 63.96%; subject to shareholder approval

Sources


NoteHave an update about this project?

Spotted something wrong or out of date? Suggest a correction for Nexchip Hefei (opens a short GitHub form; pick this facility from the list). Chinese-language sources and exchange filings are welcome.

Back to Map