SK Hynix Chongqing (Assembly & Test) · 爱思开海力士半导体(重庆)有限公司
SK Hynix | Assembly & Packaging
SK Hynix’s Chongqing back-end (2013 agreement, mass production 2014, phase-2 2019, ~$1.2B cumulative) — the assembly/test counterpart to its Wuxi DRAM and …
TipWhy This Matters
SK Hynix’s Chongqing back-end (2013 agreement, mass production 2014, phase-2 2019, ~$1.2B cumulative) — the assembly/test counterpart to its Wuxi DRAM and Dalian NAND fabs, and the reason the Korean memory maker’s China exposure is not only about wafer fabs.
Chinese name: 爱思开海力士半导体(重庆)有限公司 (Àisīkāi Hǎilìshì Bàndǎotǐ (Chóngqìng))
What does this facility make?
Packaging and test of NAND flash modules/SSD components.
Why does it matter?
As of August 2026 SK Hynix is reportedly weighing options incl. selling a stake (~$3B valuation, possible Chinese fund buyers) while keeping the site running — the first major case of a Korean memory back-end in China facing a divest-or-double-down decision under tool-control pressure.
Key Facts
| Company | SK Hynix |
| Type | Assembly & Packaging |
| Category | Foreign-Invested |
| Capability | NAND flash package-and-test — ~80 million units/month at the 2014 launch |
| Status | Operational |
| Capacity | Planned: 167,000,000 units/month, as of 2019 — planned post-phase-2 capacity: ‘接近20亿只’/yr / 12 = ~167M units/month; phase 1 alone was ~9.6亿只/yr (~80M/month, matching the 2014 figure) |
| Investment | $1,200M |
| Funding Source | Foreign |
| Location | Chongqing, Chongqing Municipality |
| Current Node | Not applicable (assembly & test) |
| Entity List | No |
| Equipment Origin | Not yet assessed |
| Last Verified | Not recorded (newest source dated Aug 2026) |
Technical Complexity
2.5/5
Packaging Technology Trajectory
- 2014: NAND flash package & test (16GB mobile NAND from Cheongju) in volume
- 2019: Phase 2 dedicated packaging plant; phase 1 becomes test-only (planned)
Project Timeline
- Jul 2013 — Site founded and breaks ground (2013-05 agreement)
- Sep 2014 — Mass production begins (~$250-300M phase 1)
- Sep 2019 — Phase-2 completed; cumulative investment ~$1.2B
- Aug 2026 — Stake-sale options reported (~$3B valuation); no decision confirmed
Sources
- SK hynix weighs options for Chongqing plant (~$3B) (Korea Herald) (15 Aug 2026)
- SK hynix Considers Selling Stake in Chongqing Plant in China, Among Other Options (EDAILY) (09 Aug 2026)
- SK 海力士重慶封測廠投產、估明年銷售上看 6 億美元 (29 Sep 2014)
- SK海力士重庆二期设备搬入,主攻封装,预计9月投产 (15 Jul 2019)