SMIC Beijing (Jingcheng) · 中芯京城
SMIC | Fab
SMIC’s Beijing expansion JV (中芯京城, 54.04% SMIC-owned), targeting 100,000 wafers/month of 12-inch, 28nm-and-above capacity in the Beijing Economic-Technological Development Area.
Chinese name: 中芯京城 (Zhōngxīn Jīngchéng)
What does this facility make?
12-inch (300mm) wafers at 28nm and more mature nodes for foundry customers.
Why does it matter?
Reported investment figures vary slightly by source — $7.6 billion (Yicai) and $7.7 billion / RMB 49.7 billion (CnTechPost) — likely the same commitment described at slightly different points or currency conversions; both are given here since no source explicitly reconciles them. Phase 1 was already in use by late 2023; a separate Phase 2 land deal (early 2026) was reported at a total project investment of no less than ¥50 billion (¥40 billion in fixed-asset investment), targeting an annual output value of at least ¥6 billion once fully ramped.
Key Facts
| Company | SMIC |
| Type | Fab |
| Category | JV |
| Capability | 12-inch (300mm) wafer foundry, 28nm and above |
| Status | Operational |
| Capacity | Planned: 100,000 wafers/month (300mm), as of 2020-08 — planned phase-1 target per framework agreement; not installed |
| Investment | ¥497亿元 / $7,600M |
| Funding Source | Local Govt |
| Location | Beijing, Beijing Municipality |
| Current Node | Not yet researched |
| Entity List | Yes — US Commerce BIS (18 Dec 2020) |
| Equipment Origin | Not yet assessed |
| Last Verified | Not recorded (newest source dated Sep 2026) |
Technical Complexity
3.9/5
Technology Node Trajectory
Node history not yet researched.
Project Timeline
- Feb 2021 — Development of the $7.6-7.7 billion Beijing fab (SMIC Jingcheng) begins; first phase targeted for completion by 2024
- Nov 2023 — Phase 1 confirmed in use, per Beijing E-Town Investment Holding disclosure
- Jan 2025 — Tongzhou district officials commit to fully completing Phase 2’s main structure, with equipment installation underway
Sources
- Chinese Chipmaker SMIC to Build USD7.6 Billion Beijing Plant (23 Feb 2021)
- SMIC builds $7.7 billion fab in Beijing, first phase expected to be completed by 2024 (23 Feb 2021)
- 中芯国际扩产迎新进展!中芯京城二期工业用地成交 拟建项目总投资不低于500亿元 (Cailianshe) (28 Sep 2026)
- 中芯国际位于北京的晶圆厂项目——中芯京城二期 (28 Sep 2026)
- 中芯国际 关于签订合作框架协议的公告 (北京亦庄) (01 Aug 2020)