SMIC Shanghai (Lingang) Phase 2 · 中芯临港二期
SMIC | Fab
smic-lingang (which covers the operational Phase 1, 20,000 wafers/month) because Phase 2 is a distinct, actively-under-c…
Tracked as a separate entry from smic-lingang (which covers the operational Phase 1, 20,000 wafers/month) because Phase 2 is a distinct, actively-under-construction expansion with its own timeline — collapsing both into a single ‘Operational’ status would have hidden the fact that this site is still a live construction project, not a finished one.
Chinese name: 中芯临港二期 (Zhōngxīn Língǎng Èrqī)
What does this facility make?
Additional 12-inch (300mm) wafer capacity at 28nm and below, once complete.
Why does it matter?
One of several cases in this tracker where a facility’s original phase is producing chips today while a large, separately-timed expansion is simultaneously under construction at the same site — a pattern that a single facility-level status field tends to obscure unless each phase gets its own entry.
Key Facts
| Company | SMIC |
| Type | Fab |
| Category | JV |
| Capability | 12-inch (300mm) wafer foundry, 28nm and below — second-phase expansion of the Lingang site |
| Status | Under Construction |
| Capacity | Not yet recorded |
| Investment | Not disclosed |
| Funding Source | Local Govt |
| Location | Shanghai, Shanghai Municipality |
| Current Node | Not yet researched |
| Entity List | Yes — US Commerce BIS (18 Dec 2020) |
| Equipment Origin | Not yet assessed |
| Last Verified | Not recorded (newest source dated Jul 2026) |
Technical Complexity
3.9/5
Technology Node Trajectory
Node history not yet researched.
Project Timeline
- Jul 2026 — China Construction Eighth Engineering Bureau wins the general contract for the Fab9-P3 building and Fab9-P4 foundation works
- Sep 2026 — Construction of Phase 2 reported as formally starting, targeting delivery by end of 2027
Sources
- 上海临港新片区芯港集成晶圆制造项目正式开工 (新浪财经) (30 Jun 2026)
- 我国多个半导体项目集中落地,投资额超1000亿,覆盖三大方向 (观察者网) (03 Jul 2026)