SMIC Shanghai (Lingang) · 中芯临港
SMIC | Fab
SMIC’s largest single fab commitment — a $8.87B (reported domestically as over ¥50 billion total investment), 100,000 wafer/month 28nm-and-below joint venture with the Shanghai municipal government in the Lingang Special Area, formally incorporated as Zhongxin Dongfang Integrated Circuit Manufacturing Co. (中芯东方集成电路制造有限公司).
Chinese name: 中芯临港 (Zhōngxīn Língǎng)
What does this facility make?
12-inch (300mm) wafers at 28nm and more mature process nodes for foundry customers.
Why does it matter?
Part of SMIC’s 2020-2022 wave of four mega-fab JVs (Shanghai, Beijing, Tianjin, Shenzhen) aimed at building mature-node capacity for domestic demand, launched in the same window SMIC itself was added to the US Entity List. This entry covers the operational Phase 1 (20,000 wafers/month, running since late 2024) specifically — the site’s actively-under-construction Phase 2 expansion is tracked as its own entry, smic-lingang-phase2, so this one’s ‘Operational’ status isn’t read as covering the whole site.
Key Facts
| Company | SMIC |
| Type | Fab |
| Category | JV |
| Capability | 12-inch (300mm) wafer foundry, 28nm and above (per SMIC filings: 28纳米及以上) |
| Status | Operational |
| Capacity | Planned: 100,000 wafers/month (300mm), as of 2021-09 — planned full build per JV framework agreement; not installed; no installed figure disclosed |
| Investment | ¥500亿元 / $8,870M |
| Funding Source | Local Govt |
| Location | Shanghai, Shanghai Municipality |
| Current Node | Not yet researched |
| Entity List | Yes — US Commerce BIS (18 Dec 2020) |
| Equipment Origin | Not yet assessed |
| Last Verified | Not recorded (newest source dated Sep 2026) |
Technical Complexity
3.9/5
Technology Node Trajectory
Node history not yet researched.
Project Timeline
- Sep 2021 — SMIC signs cooperation agreement with the Shanghai Lingang Management Committee for a $8.87 billion, 100,000 wafer/month 12-inch fab; registered capital $5.5 billion, SMIC holding no less than 51%
- Nov 2021 — Joint venture formally incorporated as Zhongxin Dongfang Integrated Circuit Manufacturing Co. (中芯东方集成电路制造有限公司)
- Dec 2024 — Phase 1 (20,000 wafers/month) reaches production
- Jul 2026 — China Construction Eighth Engineering Bureau (中建八局) wins the Phase 2 general contract for the Fab9-P3 building and Fab9-P4 foundation works in the project’s northern district
Sources
- SMIC to Build China’s Largest Fab For $8.87 Billion (06 Sep 2021)
- China’s top chip maker SMIC plans US$9 billion plant in Shanghai (06 Sep 2021)
- Semiconductor Manufacturing International Corporation (Wikipedia) — Entity List addition, 18 Dec 2020 (28 Sep 2026)
- 从’沙子到芯片’的完整产业生态,上海临港’东方芯港’全产业链集群已然成型 (Sina Finance) (20 May 2026)
- 上海临港新片区芯港集成晶圆制造项目正式开工 (Sina Finance) (30 Jun 2026)
- 中芯国际关于自愿披露签订合作框架协议的公告 (临港) (03 Sep 2021)