TSMC Nanjing · 台积电(南京)有限公司
Taiwan Semiconductor Manufacturing Company (TSMC) | Fab
TSMC’s only 12-inch (300mm) fab in mainland China (Fab 16), producing 16nm/12nm-class and 28nm mature-node chips. TSMC’s 2024 annual report was reported to put Nanjing at roughly 2.4% of company revenue. In September 2025 Washington revoked the fab’s Validated End-User (VEU) status effective 31 December 2025, and TSMC then received a one-year (calendar 2026) US export licence for US-controlled tools, replacing individual vendor licences.
Chinese name: 台积电(南京)有限公司 (Táijīdiàn (Nánjīng) Yǒuxiàn Gōngsī)
What does this facility make?
12-inch (300mm) wafers at 16nm and other mature process nodes — intentionally kept well behind TSMC’s leading-edge Taiwan/Arizona/Japan nodes.
Why does it matter?
The clearest example in this tracker of a foreign leading-edge foundry operating a deliberately mature-node-only fab in China. Nanjing stays multiple generations behind TSMC’s frontier nodes, and its US tool supply now depends on an annual licence that runs only through 2026. Renewal for 2027 had not been reported as of late November 2026.
Key Facts
| Company | Taiwan Semiconductor Manufacturing Company (TSMC) |
| Type | Fab |
| Category | Foreign-Invested |
| Capability | 12-inch (300mm) wafer foundry, 16nm and other mature nodes |
| Status | Operational |
| Capacity | Not yet recorded |
| Investment | Not disclosed |
| Funding Source | Foreign |
| Location | Nanjing, Jiangsu |
| Current Node | 28nm (new capacity opening from 2H 2022) |
| Entity List | No |
| Equipment Origin | Not yet assessed |
| Last Verified | 27 Nov 2026 |
Technical Complexity
3.5/5
Technology Node Trajectory
- 2018: 16nm FinFET (Fab 16 opening/mass-production ceremony 31 Oct 2018)
- 2022: 28nm (new capacity opening from 2H 2022)
Project Timeline
- Oct 2018 — Fab 16 opening and 16nm FinFET mass-production ceremony
- Dec 2022 — TSMC says the 28nm expansion at Nanjing is proceeding as planned, denying reports of a pause
- Sep 2025 — TSMC says the US Government has notified it that TSMC Nanjing’s VEU authorisation will be revoked effective 31 December 2025 (reported 3 Sept 2025)
- Jan 2026 — TSMC announces a US annual export licence covering US export-controlled items for TSMC Nanjing, issued before the VEU expiry, replacing individual per-shipment vendor licences for 2026
Sources
- US grants annual approval to TSMC for chipmaking tool exports to China (Reuters via Yahoo) (01 Jan 2026)
- U.S. grants TSMC annual licence to import U.S. chipmaking tools into China (CNBC) (01 Jan 2026)
- Absolutely fabless: Trump derails TSMC’s China chip-building effort (The Register) — VEU revoked effective 31 Dec 2025 (03 Sep 2025)
- 台积电南京12吋晶圆厂量产,2020年月产能达2万片 (中国闪存市场) (01 Nov 2018)
- 台积电回应’南京厂扩产暂停’传闻:按计划进行 (IT之家) (21 Dec 2022)
Spotted something wrong or out of date? Suggest a correction for TSMC Nanjing (opens a short GitHub form; pick this facility from the list). Chinese-language sources and exchange filings are welcome.