TSMC Shanghai · 台积电(上海)有限公司

Taiwan Semiconductor Manufacturing Company (TSMC) | Fab

TSMC’s original mainland China manufacturing site: Fab 10, a 200mm fab in the Songjiang Industrial Zone that began trial production in August 2004.
Published

November 27, 2026

TipWhy This Matters

TSMC’s original mainland China manufacturing site: Fab 10, a 200mm fab in the Songjiang Industrial Zone that began trial production in August 2004. It still appears on TSMC’s official fab-capacity disclosure as ‘TSMC China Company Limited’, one of TSMC’s 8-inch fabs. Build cost (~$1.3B) and a ~74,000 wafers/month planning figure circulate from secondary compilations and are not verified against TSMC filings; current capacity is not disclosed.

Chinese name: 台积电(上海)有限公司 (Táijīdiàn (Shànghǎi) Yǒuxiàn Gōngsī)

What does this facility make?

0.25µm–0.11µm-class 200mm foundry wafers — analog, sensor and mixed-signal legacy work, multiple generations behind TSMC’s frontier nodes.

Why does it matter?

Alongside Nanjing, establishes that TSMC’s mainland footprint is confined to mature and legacy process technology. TSMC said in August 2025 that it would exit 6-inch manufacturing within two years and keep consolidating 8-inch capacity; 2026 reports describe a plan to move about 80% of its 8-inch output to affiliate Vanguard (VIS). None of the reports I found names Fab 10, and no closure of the Shanghai fab has been verified as of late 2026. The January 2026 US annual tool-export licence covers TSMC Nanjing only, per TSMC’s statement; the Shanghai fab was not a VEU site.

Key Facts

Company Taiwan Semiconductor Manufacturing Company (TSMC)
Type Fab
Category Foreign-Invested
Capability 8-inch (200mm) wafer foundry — TSMC Fab 10, Songjiang; legacy/mature nodes ~0.25µm–0.13/0.11µm class (no FinFET)
Status Operational
Capacity Not yet recorded
Investment $1,300M
Funding Source Foreign
Location Shanghai, Shanghai Municipality
Current Node Not yet researched
Entity List No
Equipment Origin Not yet assessed
Last Verified 27 Nov 2026

Technical Complexity

2.5/5

Technology Node Trajectory

Node history not yet researched.

Project Timeline

  • Aug 2004 — Fab 10 (Songjiang) trial production begins — TSMC’s first mainland fab
  • Feb 2026 — Reports (Economic Daily News via TrendForce) say TSMC will shift about 80% of its ~5 million wafers/year 8-inch output to affiliate VIS over the coming years; specific fabs not named

Sources


NoteHave an update about this project?

Spotted something wrong or out of date? Suggest a correction for TSMC Shanghai (opens a short GitHub form; pick this facility from the list). Chinese-language sources and exchange filings are welcome.