Chipyear Era Xi’an (8-inch Power Semiconductor Line) · 陕西电子芯业时代科技有限公司

Shaanxi Electronics Chipyear Era Technology Co., Ltd. | Fab

Northwest China’s first 8-inch specialty-process semiconductor line — another facility this tracker missed in its first passes, illustrating that under-con…
Published

October 11, 2026

TipWhy This Matters

Northwest China’s first 8-inch specialty-process semiconductor line — another facility this tracker missed in its first passes, illustrating that under-construction projects outside the handful of best-covered hubs (Shanghai, Beijing, Shenzhen) are easy to miss without deliberately searching provincial and industry-trade coverage rather than only the most prominent national outlets.

Chinese name: 陕西电子芯业时代科技有限公司 (Shǎnxī Diànzǐ Xīnyè Shídài Kējì Yǒuxiàn Gōngsī)

What does this facility make?

Industrial-grade and automotive-grade power semiconductors — IGBTs and silicon carbide (SiC) chips — for EVs, renewable energy storage, and AI data center power systems, not logic or memory.

Why does it matter?

A reminder that China’s fab build-out is not only about advanced logic and memory — mature-node power semiconductors for the EV and renewable-energy supply chains are a large, separate wave of construction with their own set of projects, mostly outside the export-control narrative entirely.

Key Facts

Company Shaanxi Electronics Chipyear Era Technology Co., Ltd.
Type Fab
Category State-Backed
Capability 8-inch (200mm) power semiconductor fab — IGBT, silicon carbide (SiC) chips
Status Under Construction
Capacity Not yet recorded
Investment ¥45亿元
Funding Source Local Govt
Location Xi’an, Shaanxi
Current Node Not yet researched
Entity List No
Equipment Origin Not yet assessed
Last Verified Not recorded (newest source dated Oct 2026)

Technical Complexity

2.9/5

Technology Node Trajectory

Node history not yet researched.

Project Timeline

  • Dec 2025 — Phase 1 (¥3.2 billion, 50,000 wafers/month design capacity) completes and enters production
  • Sep 2026 — Phase 2 construction preparation begins, formal start targeted for Q3 2026, (the 8-inch line’s total investment is ¥4.5 billion per Shaanxi SASAC, ¥3.2 billion of it spent in Phase 1; a larger ¥19 billion plan appears only in secondary coverage)